Rendering Guide

Coverage Rates for Render

Coverage rates per 25kg bag (approximate): traditional sand/cement scratch coat at 12mm: approximately 0.9-1.0 m² per 25kg bag. Top coat at 6mm: approximately 2.0-2.2 m² per 25kg bag. Monocouche at 15mm (e.g. K-Rend, Weber One): approximately 0.7-0.8 m² per 25kg bag. Thin coat (1.5mm silicone/acrylic): approximately 6-7 m² per 25kg bag. Roughcast at 18mm: approximately 0.6-0.7 m² per 25kg bag. These rates vary with surface texture and application method — always check manufacturer's specific pro

Preparation is Critical

The render will only be as good as the background. Essential preparation: brush off all loose material, dust, and organic growth. Allow new blockwork to cure for at least 28 days. PVA/SBR bonding agent: apply to very smooth or low-absorption surfaces (dense concrete, glazed bricks) to improve adhesion. Allow to become tacky before applying render (not wet). Expanded metal lath (EML) or beads: fix stop beads at all reveals and edges. Use angle beads at external corners. Ensure all electrical and

Monocouche vs Traditional Render

Monocouche (single-coat): factory-coloured through-coloured system. Scratch, fill, and finish in one pass. Faster application. More expensive per bag but fewer bags overall. Better crack resistance (flexible polymer additives). Self-cleaning properties on silicone systems. Traditional 2-coat: scratch coat (1:4 cement:sharp sand at 12mm). Fibrous undercoat or topcoat. Finish coat with texture/colour wash applied separately. Lower material cost. More skill-intensive. Paint required for colour. Bot

Mixing and Application

Traditional sand/cement render mix: 1 part cement : 4 parts sharp sand (scratch coat). 1 part cement : 5-6 parts sharp sand (top coat). Use a plasticiser (not washing up liquid) in the mix for workability. Mix ratio for water: approximately 0.4-0.5 litres per kg of dry material. Mix to a stiff but workable consistency — render should stay on an inverted trowel. Application: pre-dampen the surface. Apply scratch coat, press firmly, rule off to beads/guides. Score horizontally before it sets (for